Visual simulation of future Hydroelectric Power Plant Moste
We elaborated visual simulation of the future hydroelectric power plant HPP Moste for the purposes of Savske elektrarne Ljubljana company. The most contetious part of this project is the artifical lake that will be created by the damming up of the river in the vicinity of the Bled Golf Course.
Since the physical environment will be substantially altered by the entire project, its visual presentation is of great importance. Thanks to modern visual simulation we are able to present -to the expert and to the layman alike - the actual conditions after the construction of the projected hydroelectric facility.
Our intention is to provide the proponents, as well as the critics of the construction, with an insight into the advantages of this technology. This will assist them in the discussions of this sensitive issue, and will enable them to arrive at a more informed decision.
|