Business solutions:
» customer priority
» development
» implementation
» presentation


Information solutions:
» internet app.
» portals
» business app.
» simulators
» mobile solutions
» education



Projects « Back

Virtual Battlefield
Crisis Response Operations Simulator
Simulation Model of Terrorist Activities
Visual simulation of the rescue exercise Tunnels
Visual simulation of the rescue exercise Golica
Visual software solution for HPP Vrhovo
Visual software solution for HPP Mavcice
Visual simulation of future HPP Blanca and HPP Krsko
Visual simulation of future HPP Moste
Visual simulation of PHPP Kozjak
Strategic planning at Ministry of the Economy
Programme solution Central Dogs Register
Virtual Ljubljana
Sailboat Elan 45
Documents tracing DT/NEK
Steam generator replacement in NPP Krsko
Funicular railway
Trubar's quarter
Virtual nuclear power plant
Tourist information portal Ljubljana
CAC (Cisco Accounting)
Internet portal e-Ljubljana.com

Visual simulation of upper reservoir lake for Pumping Hydroelectric Power Station Kozjak

For the Drava Power Station Maribor we created computer visual simulations of an installation of an upper reservoir lake for the proposed Pumping Hydroelectric Power Station Kozjak.

The construction of an upper reservoir lake represents a large encroachment upon the environment. Developing a "virtual representation" of the proposed reservoir lake allowed us, along with the consignee, to test differing configurations to find the best configuration for the location.

The virtual possibilities, provided through the representations, for the placement of the reservoir lake will aid the consignee in developing the best solution from an engineering and environmental point of view. The virtual representations of the project will allow neighbouring inhabitants and the broader public a clear insight in to the situation after the construction.

CHE Kozjak will use the periods of low electricity use (and cost) for pumping water into the upper reservoir pool. At times of high electricity usage, water that has accumulated in the upper reservoir pool will be let through the turbines to produce additional electricity. This allows for a special sort of electrical transformation.


top  |  about us  |  services  |  projects  |  news  |  slovensko  |  home
© 2003-2010 Logon. All rights reserved.